About us

20 years of experience.

Cielpanel is founded in 1998 in Santiago (Chile), as contractors in carpentry and drywall (ITC) in the construction retail area.
We started in the photovoltaic mechanical ground mounting plants, and in 2016 we performed our first contract in El Romero (246MWp) of Acciona in Vallenar (Chile), with STI-Norland. Hereinafter we participated in 6 more projects, getting experience in installations with tracking structures.
We have incorporated all the necessary machinery for the performing of mounting , going through the topography, the driving and drilling, the assembly of structures and the installation of photovoltaic modules. Until today, we are performing the mechanical mounting of 2 PV plants.
20

Years

of experience

516

IT

projects

8

FV

projects

3

Operational

countries

Partners

Julio Delgado Canales

PV Operational Director

Civil Engineer U.de Chile

Msc. Design and Sustainable Construction UDD

Rodrigo Añazco Saba

PV Commercial Director

Civil industrial Engineer U. de Chile

Materials Civil Engineer IDIEM

Cielpanel Trajectory

Trayectoria Cielpanel

Trayectoria Cielpanel
2018
August 9

1997

Fundación de Cielpanel
August 9

1998

Primeras obras en Santiago de Chile
August 9

2006

Trabajos en Isla de Pascua
August 9

2008

Primera obra en Colombia
August 9

2009

Primera obra en Perú
August 9

2015

Primer contrato Fotovoltaico. Instalación paneles FV, El Romero 246 MWp.
August 9

2016

Inicio trabajos sector minero: Campamento minero Mejillones
August 9

2017

Primer contrato Fotovoltaico: Estructuras + Instalación paneles FV.
August 9

2018

Primer contrato Montaje Completo: adquisición maquinarias, hincados, estructuras e instalación paneles FV.
August 9

1997

Foundation of Cielpanel
August 9

1998

First Projects in Santiago, Chile
August 9

2006

Construction Work in Easter Island
August 9

2008

First construction work in Colombia
August 9

2009

First construction work in Perú
August 9

2015

First Photovoltaic contract Installation of PV panels, El Romero 246MWp.
August 9

2016

Start works in mining area Mejillones mining camp.
August 9

2017

First photovoltaic contract. Structures + Installation of PV panels.
August 9

2018

First Full Assembly contract Acquisition of machinery Driving, structures and installation of PV panels.

invest

in us

Diseñado por Dekaz